Skip to content

Freight

The facility does not accept, store, or ship freight or packages for exhibitors, delegates or the Client before, during or after an event. Freight must be consigned to the GSC or delivered directly to the Client during the leased period specified on the contract. The ACC will decline receipt of any shipments arriving prior to the first contract day. ACC personnel are not permitted to sign for shipments at any time. All freight must be shipped to the General Service Contractor or drayage company before the event. All materials, equipment and/or freight are to be delivered and removed through the service yard entrance. The ACC is not responsible for any loss or damage to properties of any kind shipped or otherwise delivered to the facility.